Official Announcement Timeline
Updated
Read the dates before you reuse a sentence. The Doki Test starts 17 December 2026 and has no published end. The 15 July 2026 version notice and the 5 August 2026 weekly notes describe an earlier test build. They are official, and they are not the December rules.
The English news feed, pulled on 28 November 2026, held six articles. Two of them are image posts from that earlier test. One is the October FAQ. The press article and the November X posts sit on top of that list and are the ones that name December.
- Epic wishlist and full Doki Test intelOfficial X named 17 December, a limited closed beta with a data wipe, and iOS, Android, and PC, then posted the Epic wishlist short link. No end date.
- Level Infinite confirms the Doki TestPress article dated 11/20/2026. Developed by Fizzglee Studio. Limited, non-monetized, data-wiping closed beta. Global launch follows with no date.
- Doki Test FAQ imagesOfficial news article. Device table, five text languages, survey is not a guaranteed seat, and start and end dates were still to be announced separately.
- BUS Cruise WeeklyEarlier test-period patch notes. Quiz stages and bug fixes. Not a Doki Test rule.
- Chase, Integrate, Ride On!Earlier version-update notice with a then-current banner list, outfits, and bikes. Not the Doki Test roster.
- KALEIDO Test recruitment and event termsAn earlier closed-test recruitment post, plus community-event terms that require 18 or the local age of majority.
- First reveal trailer newsFizzglee Studio trailer post. The article says the trailer releases 9 April 2025 and names Prome, Nana, UC, and Adodol.
December, which is the current test
On 20 November 2026 the Level Infinite press room published "Chasing Kaleidorider Doki Test Confirmed for December 17." The page date is 11/20/2026 with no clock and no timezone. The article says the game is developed by Fizzglee Studio, calls the test a limited-capacity non-monetized closed beta that wipes data, puts it on Android, iOS, and PC, and says the global launch follows shortly after. The press room is Level Infinite, and the assets area on that page is marked From Level Infinite. Fizzglee Studio's about line on the same page says it is a Tencent game development label. Those are three layers, not one publisher credit. Pre-register keeps the links straight.
The same day, official X posted "Doki Test Locks In for December 17" at 12:00 UTC. On 21 November at 02:00 UTC the account posted "Doki Test - Full Intel Revealed": start date 17 December, limited closed beta with a data wipe, platforms iOS, Android, and PC. A reply at 02:00:39 UTC points back at the October FAQ thread. Later that morning, at 08:00 UTC, the account said Epic wishlisting is open, and a follow-up posted the short link. None of those posts print an end date, an opening hour, or a launch day. The rules you should plan with are on Doki Test. The application is on Sign-up.
October FAQ, still the spec source
The news article "Doki Test · FAQ" was released 22 October 2026. Its body is four images. They cover the data wipe, the lack of in-app purchases, the five text languages, the three platforms, the device table, the limited slots, the locked questionnaire, login by survey email, the ban on selling seats, and the line that start and end dates would be announced separately. Official X first posted that FAQ at 02:00 UTC on 22 October 2026, which is 22:00 EDT on 21 October, and linked it again under the November intel post. Requirements transcribes the device image. The "announced separately" sentence is why the end date is still blank after the start date was filled in.
July and August, an earlier build
On 15 July 2026 the article "Chase, Integrate, Ride On!" went up as a version update notice. The banner art says VERSION UPDATE NOTICE. The body images describe that test's calls, outfits, bikes, dates, and a lounge. The standard character call The First Light lists S-Rank Prome, Akiko, Jormungia, and Yang, and A-Rank Nana, UC, Adodol, Hazuki, Haru, Sera, Mehaya, Giselle, Riyuko, Lucinia, and Metis, with Misty featured and a qualitative drop-rate boost. Signature bike Wildfire RR is named for Misty in that same notice. Outfits named for redemption with Premium Vouchers in that test include Nana's Way of Water, Misty's Nocturne Op.55 No.1, UC's Whale Shark Diary, and Adodol's Whispers of the Wind. The notice also says the lounge is open for all 16 characters during that test.
Those sentences are about the build people were playing in July. The Doki Test FAQ, written later, says the December test is still in development and is not the final game. Do not copy July voucher prices, July date rosters, or the Misty boost onto December. Riders repeats the names only so you can see the date next to each one.
On 5 August 2026, "BUS Cruise Weekly" went up as weekly patch notes. The banner says so in those words. The notes add stages to a KALEIDO Quiz Challenge, mention a localization fix in a Band Tour interface, and point at bug fixes. That is maintenance on the earlier build. It does not move the Doki Test.
Earlier still
On 8 June 2026 the feed released two articles at once. One is the community-event terms, still the rule sheet for social prizes, summarized on Events. The other announces that global recruitment for a closed test was open and points at a trailer called EVO Search Warrant. The article's own wording is "Developed by Tencent's Fizzglee Studio" and it describes a KALEIDO Test sign-up, a first closed beta in the summer of 2025, and a Tokyo Game Show appearance. Keep that credit line inside the June article. The November press article separates "developed by Fizzglee Studio" from "Fizzglee Studio is a Tencent game development label."
The oldest English article in the feed is the 7 April 2025 reveal. It says the first trailer releases on 9 April 2025, credits Fizzglee Studio, names a theme song by the utaite 96Neko, and shows Prome, Nana, UC, and Adodol. The setting it describes, Terminus, Integration, the Sea of Unconsciousness, HYSTERIA, and the NAVIGATOR with KALEIDO VISION, matches the current site description. The cast it names is the small early set, not a full roster.
Verdict: Plan December from the 20 and 21 November posts plus the October FAQ. Use July and August only as a dated look at an earlier build. Use June as history and as the event-terms source, not as the Doki Test schedule.
FAQ
Did the game already have a test before the Doki Test?
Yes. The June 2026 recruitment article describes an earlier closed test and a summer 2025 beta, and the July and August news posts are patch notes from a later build of that period.
Is "shortly after" a month?
The press article does not define it. There is no launch date to count from.
Which post should I trust for the PC spec?
The October FAQ image, not the July notice. The spec page is Requirements.
Why does one article say "Tencent's Fizzglee Studio"?
That phrase is in the 8 June 2026 recruitment article. The 20 November press article uses a split credit. Both are official. They are not the same sentence, and neither one is the Taiwan agent named on the /tw/ footer.
Where is the Epic link in this timeline?
In the 21 November wishlist post and the reply that followed it. The link list is on Pre-register.
Sources: Official English news feed, Level Infinite press article, official X